Airport Line Marking
At NASAM we carry out airport line marking works for runways, taxiways and aprons on airports and airbases Australia-wide, with minimal impact to daily operations.
Our Difference
At National Airside Safety & Maintenance, we only use high quality Wattyl Air Pave paint to carry out line-marking projects, and work in accordance with MOS139 standards.
All our maintenance team members hold current ASIC and DCAC accreditation. All staff are thoroughly educated in the methods and standards they need to abide by, and follow the directions of the Work Safety Officer (WSO) in relation to entering active airfield sites.
Airport Line Marking Services
Airport line marking work is done in a timely and safe manner. Depending on airside access, we usually allow for 3-4 shifts spanning 23-30 hours. We use Wattyl Air Pave paint, which is the industry recommended paint for all such works.
At NASAM, we provide the following services:
-
Crack sealing
-
Bitumen rejuvenation
-
Concrete joint repairs
-
Herbicide spraying
-
Gable marker replacement
-
Windsock replacement
We’re also environmentally aware and strive to leave a minimal impact on the airfield. No waste water or empty drums are left behind, instead all waste material is taken with us at completion of the project, leaving the site clean and tidy.
Contact Us
Get in touch with the team at NASAM for all of your Airport Line Marking requirements. Call us on 0422 168 142, or alternatively you can fill out the online form below, submit and we’ll get in touch with you shortly.
"*" indicates required fields